
Paris - Orly
T9 Tramway
From Porte de Choisy to the new Orly city centre, the former RN305 continues its redevelopment as a calm urban avenue, vector of transit and urban regeneration.


Project to unite an entire region, the tramway defines the new unified urban space of Boulevard des Arts and designs future transit spaces, from T3 to RER C via the Grand Paris Express train station.
Adapting to the site characteristics, development stages the urban planning of the vast 20th century estates such as the Château de Choisy-le-Roi and anticipates future urban development within this changing sector.






Status
2013 preliminary studies - February 2018 construction commencement - March 2021 commissioned
Location
Paris (75) / Ivry-sur-Seine - Vitry-sur-Seine - Thiais - Choisy-le-Roi - Orly (94)
Client
Île-de-France Mobilités/client representative Transamo
Commission
Design and construction transportation services and development + construction consultants coordination (SMR and system)
Programme
10.3km tramline + 19 tram stops
Cost
200 M€
Design team
Ingérop + Setec + Richez_Associés + Concepto + Bérim + Planitec
Design and Communication Codes
RCP
Tram Stop Furniture Designers
Richez_Associes + Sovann Kim
Photographer
Cécile Septet + Baptiste Jayat