Grand Paris Express
Villiers–Champigny–Bry Station
The Villiers–Champigny–Bry station provides an interchange between Line 15 and MRT Line E, serving a future development area at the intersection of three municipalities. The station plays a central role in the «Marne-Europe» district.
2 | gare RER E
3 | Marne Europe
It anchors a major urban block combining public services, housing, and family residences, and establishes a new urban sequence that bridges the existing railway tracks.
The 20-metre level difference between the metro platforms, MRT platforms, and the urban access crossing the tracks gives rise to a large, naturally lit circulation space, fully south-facing.
This generous walkway is structured by a vertical wall that folds up to form the ceiling, carrying a territorial narrative: the theme of photographic imagery — a nod to Daguerre, born in Bry, and to the long-standing presence of INA’s iconic film studios...
Status
Tender December 2012 - Completion due 2026
Location
Champigny-sur-Marne (94)
Client
Société des Grands Projets
Programme
Grand Paris Express station providing connections with metro Line 15, MRT line E, Altival BRT, and the bus terminal.
Area
15.500 m²
Cost
98 M€
Design team
Richez_Associés + Systra (lead)
Awards
Nominated for " BIM d’Or 2016 "