Villiers–Champigny–Bry Station bvc_couverture

Grand Paris Express

Villiers–Champigny–Bry Station

The Villiers–Champigny–Bry station provides an interchange between Line 15 and MRT Line E, serving a future development area at the intersection of three municipalities. The station plays a central role in the «Marne-Europe» district.

Villiers–Champigny–Bry Station bvc_carte-situation
1 | gare Grand Paris Express
2 | gare RER E
3 | Marne Europe
Villiers–Champigny–Bry Station bvc_coupe

It anchors a major urban block combining public services, housing, and family residences, and establishes a new urban sequence that bridges the existing railway tracks.

The 20-metre level difference between the metro platforms, MRT platforms, and the urban access crossing the tracks gives rise to a large, naturally lit circulation space, fully south-facing.

Villiers–Champigny–Bry Station bvc_02
Villiers–Champigny–Bry Station bvc_04

This generous walkway is structured by a vertical wall that folds up to form the ceiling, carrying a territorial narrative: the theme of photographic imagery — a nod to Daguerre, born in Bry, and to the long-standing presence of INA’s iconic film studios...

Villiers–Champigny–Bry Station bvc_03

Status

Tender December 2012 - Completion due 2026

Location

Champigny-sur-Marne (94)

Client

Société des Grands Projets

Programme

Grand Paris Express station providing connections with metro Line 15, MRT line E, Altival BRT, and the bus terminal.

Area

15.500 m²

Cost

98 M€

Design team

Richez_Associés + Systra (lead)

Awards

Nominated for " BIM d’Or 2016 "