Tours Tramway trs_couverture

Tours

Tours Tramway

Tours councillors wanted to give their tramway project a rarely sought after coherence to the design of rolling stock and furniture, urban development and public lighting, urban strategy and public artworks...

Tours Tramway trs_trace
Tours Tramway tramway-tours-septembre-2013-13
Tours Tramway tramway-tours-septembre-2013-139

To this end a committee led by RCP (designer) produced and published guidelines.

It proposed to make the tramway a new feature within the city landscape.

Tours Tramway tramway-tours-septembre-2013-177
Tours Tramway tramway-tours-septembre-2013-235_retouche
Tours Tramway tramway-tours-septembre-2013-168

This imperative strongly marking the implantation of the tram along the axis which defines the city; carefully reworking the ground cover within the conservation area; developing a sustainable landscape project; and incorporating within the station, artwork by Daniel Buren …

Tours Tramway tramway-tours-septembre-2013-120_retouche
Tours Tramway tramway-tours-septembre-2013-299_retouche
Tours Tramway tramway-tours-septembre-2013-264
Tours Tramway tramway-tours-septembre-2013-260

Status

AVP 2009 - mise en service septembre 2013

Location

Tours (37)

Client

Citétram pour le compte du Sitcat (Syndicat des Transports en Commun de l’Agglomération Tourangelle)

Programme

Systèmes et aménagements pour une ligne de 14,8 km

Cost

369 M€

Design team

Systra + Xelis + Safege + ECCTA + Richez_Associés + Ivars&Ballet + RCP + Daniel Buren + Pierre Bideau

Sustainable development

Plateforme perméable + végétalisations alternatives